Step 1: Separate diesel from gas before you compare anything
-
Step 2: Verify the dealer's authorization, not just their website
-
Step 3: Get the enclosure spec in writing
-
Step 4: Stock the small parts before you need them
-
Step 5: Learn how to adjust the spark plug gap yourself
-
Step 6: Confirm invoicing and PO process before the first order
-
Step 7: Write delivery and commissioning into the quote
-
Step 8: Start the maintenance log on day one
-
Things that go wrong (and how to avoid them)
I've managed generator purchasing and service contracts for a 240-person company since 2020 — roughly $40,000 a year across six vendors, split between facilities and finance. Two years ago we replaced an aging standby unit with a Kohler 500kW diesel generator. I still handle the portable gas units our field crews drag around. This is the checklist I actually run, not the version the sales rep hands you at the end of a site visit.
Eight steps. The first five apply whether you're buying new or keeping something alive. The last three are about not getting burned after the money leaves your account.
Step 1: Separate diesel from gas before you compare anything
This sounds obvious. It isn't. The maintenance logic for a Kohler 500kW diesel generator and a 7kW portable gasoline unit has almost nothing in common — diesel is compression ignition, no spark plugs, no gap to set, different service intervals entirely. If you write one generic "generator maintenance" procedure for your team, someone will eventually try to gap a plug on a machine that doesn't have one, or skip a fuel-system check because "the portable ones don't need it."
Before you talk to any dealer, write down two columns: what's the peak load, and what's the continuous load. For our standby unit we needed 500kW to cover the data room plus life-safety circuits during an outage — that's a different procurement conversation than the 8kW portables the crews use. Per NFPA 110, the classification of your emergency power supply system (Level 1 vs. Level 2) also drives testing requirements, so know which tier you're in before the quote stage.
Step 2: Verify the dealer's authorization, not just their website
Anyone can put a logo on a homepage. Authorization is a different thing — it's what determines whether warranty claims get honored and whether the techs have actually been trained on your model.
Kohler publishes an authorized dealer locator on their site. When I needed coverage for our UK site, I searched kohler generator dealers in coventry and cross-checked the results against the manufacturer's own list — several "authorized" claims on local business directories didn't match. Ask for the authorization certificate, and ask for two reference installations of similar size and fuel type. If they can't produce either within a day, that's your answer.
Here's the part that's changed: ten years ago this was a Yellow Pages exercise and a handshake. Now the verification is faster, but the underlying question is the same as it's always been — can this dealer pick up the phone at 2am when the transfer switch doesn't transfer? No amount of online research answers that. You still have to call the references.
Step 3: Get the enclosure spec in writing
If you're buying a metal portable generator enclosure, "metal" is not a specification. It's a category. What you actually need on the quote:
- Gauge of the steel (14-gauge vs. 20-gauge is a real cost difference, and a real durability difference)
- Coating type — powder coat vs. paint, and whether it's rated for the climate you're storing it in
- Locking mechanism and whether it accepts a padlock or a cylinder lock
- Whether the enclosure is rated for running the unit inside it, or only for storage (this one trips people up)
- Noise attenuation rating in dB if you're anywhere near a property line
(Note to self: I keep meaning to photograph the nameplate on ours for the asset register. Still haven't.)
Step 4: Stock the small parts before you need them
Spark plug wire connectors are a $4 part that will shut down a crew for a weekend if you don't have one. Different engine families use different connector styles — boot angle, terminal type, whether it's a snap-on or threaded connection — and the parts diagram in the manual is the only reliable reference.
We keep a small bin per generator model: two connectors, two plugs, an air filter, an oil filter, and a spare fuel line. Total cost is maybe $150 per machine. The first time we didn't have a connector on a Friday afternoon, the crew improvised with electrical tape. It ran for about twenty minutes. I won't tell you what the weekend overtime cost.
Step 5: Learn how to adjust the spark plug gap yourself
This is the step most facility admins skip, and it's the one that pays off fastest on the portable units. Nobody wants to schedule a service call for a five-minute job.
Here's how to adjust spark plug gap without wrecking the plug:
- Pull the manual and find the specified gap for your exact model. Most small gasoline engines call for somewhere in the 0.020–0.030 in (0.5–0.76 mm) range, but "most" isn't "yours" — the manual wins every time.
- Let the engine cool completely. Adjusting on a warm plug is how you crack the insulator.
- Use a wire-type feeler gauge, not a coin or a business card. The wire gauge lets you measure without forcing.
- If the gap is too narrow, bend the ground electrode (the L-shaped arm) outward with the gauge's adjustment notch. Never pry against the center electrode — that's the part that sets the plug's heat range, and once it's off, the plug is trash.
- If the gap is too wide, tap the ground electrode gently on a hard surface, then re-measure. Small taps, check, repeat.
- Reinstall to the torque spec in the manual. Over-tightening crushes the crush washer and changes the plug's reach into the cylinder.
The thing most people miss: check the gap at every oil change, not just when the engine starts running rough. By the time it's missing, you've already been running it inefficiently for weeks. I didn't understand this until our backup portable failed a load test two days before a storm — the gap had opened up and nobody had looked at it in eighteen months.
Step 6: Confirm invoicing and PO process before the first order
This is the rookie mistake I made in my first year, and it cost me $600 out of the department budget. Found a great price on a small generator from a new supplier. They couldn't provide a proper invoice — handwritten receipt only. Finance rejected the expense report. I ate it.
Now, before I place any order over about $500, I ask three questions in writing: Can you issue a proper invoice with our PO number? What are your payment terms? Who do I contact if the invoice gets disputed? If any of those come back vague, I move on. A 10% cheaper unit isn't cheaper if accounting won't process the bill.
Step 7: Write delivery and commissioning into the quote
For the 500kW diesel unit, delivery was the easy part. Commissioning — the load bank test, the transfer switch integration, the operator walkthrough — is where schedules slip. Make sure the quote specifies who performs it, what documentation you receive (test reports, as-built drawings), and what happens if the unit doesn't pass load test on the first attempt.
We had a commissioning delay of nine days because the dealer's tech was pulled to another job and nobody had put a completion date in the contract. Nine days of running on the old unit, which we'd already sold. Not ideal.
Step 8: Start the maintenance log on day one
Date, run hours, work performed, parts used, technician name. Every time. Warranty claims and resale value both depend on this log, and it takes about ninety seconds to update. We use a shared spreadsheet (yes, still a spreadsheet) plus a paper copy in the enclosure.
There's something satisfying about pulling a five-year service history out of a folder and handing it to an auditor. After the mess of our first two years — missing records, a warranty claim denied for lack of documentation — finally having it organized feels like a small victory.
Things that go wrong (and how to avoid them)
- Assuming the quote includes commissioning. It usually doesn't unless you ask. Get it in writing.
- Using a generic gap spec from the internet. Every engine family is slightly different. The manual is the only source that matters.
- Treating diesel and gas units as the same maintenance stream. They aren't. Build two separate logs.
- Buying the enclosure before checking the run rating. A storage-only enclosure will overheat a running unit. Confirm the rating in writing.
- Skipping the reference call. Dealers who can't produce two references are telling you something.
- Ordering spare connectors without the parts diagram. Boot angle matters more than you'd think.
The fundamentals of this job haven't changed much — verify who you're buying from, get the spec in writing, keep records. What's changed is how fast you can do the verification. As of January 2025, the dealer locator and the manual library are both a search away. Use them before you sign.
Leave a Reply